Water Fall Contruction |
| This page shows the construction of the waterfall. As you will see, the waterfall was built on top of the tunnel structure. |

| After placing the tunnel structure, cement blocks were assembled on top of the structure to create height. |

| Once the blocks were at the desired height, a pong liner was placed under the area of the water fall and then the rocks were positioned. Placement of the rocks is the most difficult process as you have to see the rock, determine how it should be placed and place it. Jeri and her father fortunately have this talent. Even so it took several weeks to get all the rocks into the correct positions. |




With the rocks in place the water fall was testedand re tested many times. |



| There have been several more changes made that we don't have pictures of, but as you can see, it looks pretty good. |